Skip to content
Back to overview

MVP Development / Digitization / Regulated Industry

Baukraft360 – AI Software for Building Surveyors (Funded MVP)

AI software for building surveyors: Baukraft360 drafts inspection reports with AI and replaces clipboard and Word. Target: 50% less time per report. Funded MVP for k-oenic, launch planned for October 2026.

Baukraft360 – AI Software for Building Surveyors (Funded MVP)

Starting point

Building surveyors often still work with a clipboard, a digital camera and Word. Each site visit produces 20 to 50 photos that are inserted into the document by hand. Depending on scope, a single report takes 5 to 40 hours, and one surveyor writes 40 to 60 of them per year.

The software on the market feels like it is from the Windows 95 era: no mobile app, no AI, no modern interface. At the same time, the industry is short of skilled workers. Every hour spent on post-processing is an hour missing for the next job.

Solution

For k-oenic projectconsulting UG, TAISC is building a funded MVP that digitizes the inspection report process:

  • AI-assisted drafting of inspection reports
  • Digital signature (eIDAS-compliant)
  • GDPR-compliant cloud archiving for 10 years
  • Legal compliance per DEKRA standards
  • Web app plus native apps for Android and iOS

The AI produces drafts, while professional responsibility stays with the surveyor, who reviews and signs. In a specialist product like this, the human-in-the-loop principle is a given.

The project is funded by the State of Baden-Württemberg. How funding and AI-assisted development reduce your share of MVP costs is covered in What an MVP really costs in 2026.

Technology stack

  • Next.js + Node.js (full-stack)
  • LLM integration via Azure AI Foundry (report drafts)
  • Digital signature (eIDAS-compliant)
  • Cloud archiving (GDPR-compliant)
  • Native app layer (web, Android, iOS)

Result & Impact

  • Target: 50% time savings per inspection report
  • Potential of 60 to 180 hours per surveyor per year (estimate): assuming 3 to 6 hours of post-processing per report, half of it saved, at 40 to 60 reports per year
  • Kick-off in May 2026, launch planned for October 2026
  • Funded by the State of Baden-Württemberg